Campus Allocation: $45,910,000 SUCF 2004-09 Capital Plan
SUCF Project Number |
Status |
Project Manager |
Project Description |
02M05 |
30% executed |
various |
M&R (lump sum) Program (annual allocations): infrastructure capital repairs |
02256 |
40% complete |
Bill |
Alterations for Safety Phase 6 . Life Safety improvements at Allen and Drake: Allen fire alarm, elevators, exit doors, generator; Drake exit doors |
02335 |
under design by NYPA |
Bill |
Roof Replacement at Morgan and Neff |
02487 |
75% complete |
Bill |
ADA Phase 4: compliant restroom renovations at Smith, Edwards, Seymour, Chapman, Cooper, Tuttle North. |
02336 |
see 02343 for roof see 02346 for walls |
Gary |
Drake Exterior Envelope Phase 2 : transferred $1,682k + $500k = $2,182k to 02346 |
02337 |
under design by NYPA |
John |
MetroCenter Energy and Safety Phase 1 : Life Safety (fire alarm, sprinklers), HVAC energy conservation |
02338 |
under design by FB |
Gary |
Hartwell Hall replace roof and repair exterior walls |
02339 |
under design by NYPA |
Bill |
Rakov Energy and Safety : provide new HVAC system, replace windows, life safety (fire alarm) improvements |
02340 |
under design by TRM |
Bill |
Heating Plant Abatement / Alterations : abate asbestos, remove abandoned heating equipment, reroof, repair windows, modify interior. |
02823 |
program study by HHL |
Gary |
Tower/Smith/Edwards program study |
02341 |
consultant selection in progress by SUCF |
Gary |
Tower Fine Arts life safety (fire alarm, sprinklers) and HVAC (studio ventilation) improvements, haz mat remediation ( combine with 02347 Smith for design only ). |
02342 |
revise scope / campus let |
John |
Environmental remediation/compliance : Allen photo/print vent, Volatile Storage Building compliance (see below), vehicle wash facility, Chapman petroleum storage (done). |
02364 |
new emergency project |
John, Bob |
Replace fire detection/suppression system at Volatile Chemical Storage Building. |
02343 |
under design by FFAEB |
Bill |
Multiple Roof Replacements : Tuttle N. (partial) , Tuttle S., Drake. |
02344 |
design only |
tbd |
Renovate Lathrop : upgrade fire alarm, ADA compliance renovations, haz mat remediation (final configuration). |
02821 |
pre-scope |
John |
Tuttle North phasing/feasibility study: Nursing, Athletics, PES, Special Event Recreation Center coordination. |
02345 |
design only, constr. next cycle with Event Center |
Gary |
Tuttle North : HVAC/Mech repairs and Energy Conservation, interior reconstruction |
02346 |
Tuttle North exterior plus Drake exterior |
Gary |
Tuttle North : Exterior (east plaza/entry) and Structural (masonry, concrete) Repairs, Drake exterior walls |
02347 |
consultant selection in progress by SUCF |
Gary |
Smith Hall : haz mat abate., life safety, lab renov., (fume hoods), MEP upgrades ( combine w/ 02341 TFA design ). |
02348 |
design by C & S |
Bill |
Multiple Fire Alarm Upgrades : Drake, Brockway, Holmes, FOB, Hazen, Dailey. |
02349 |
planning only, design / construction next cycle |
Gary |
Edwards : haz mat abatement, fire alarm upgrade, interior renovations / reconfigurations (see 02823). |
02350 |
design by NYPA |
Bill |
Replace 7 roof top HVAC units at FOB |
02356 |
design by NYPA |
Bill |
Harrison Hall: replace roof, structural modifications |
02351 |
revise scope |
tbd |
ADA and code compliance renovations Phase 2 (note: originally Harrison and Cooper (both done) - add ADA restrooms for Drake, bridge exterior elevator. |
02352 |
revise scope |
tbd |
Site infrastructure improvements (repair/replace: storm water drains, sanitary drains, pedestrian walks, roadways, telephone trunk line; provide CAD survey) |
02xyz |
new addition to capital plan |
tbd |
Replace roof at Cooper Hall |
02xyz |
new addition to capital plan |
tbd |
Replace east side seating/steps with aluminum at Special Olympics Stadium |
02xyz |
new addition to capital plan |
tbd |
Planning study for next 5 year capital plan 2009-14 |
SUCF/College |
balance account |
||
total SUCF funded projects |
|||
02xyz |
new funding |
tbd |
proposed Event Center design/prelim. construction |
02822 |
feasibility study by HHL |
John |
proposed new/renovated facility for REOC |
02356 |
design by NYPA |
Bill |
Renovate Harrison Dining Hall [BASC funded] |